Sure Steel, Inc. is proud to have been the steel erector for this warehouse facility located in Temple, Texas. This project began in 2020 and was completed in 2021.

This 398,500 square foot warehouse was a turnkey metal building system and structural steel hybrid project. Sure Steel worked with Hill & Wilkinson General Contractors and Lehigh Valley Technical Associates, Inc. to erect 2,045 tons of steel. In total, Sure Steel worked 62,099 man hours.

This was a very complex project which required incorporating multiple structural steel designs, concrete tilt up panels, large and multiple interior structural mezzanines, joist and deck, insulated metal wall panels, gratings, stairs, catwalks and standing seam roofing. This project is a prime example of all the various scopes of work that a General Contractor can put under Sure Steel’s umbrella and allow us to manage seamless coordination of the various scopes.

East Penn2
  • Date: May 2021
  • Location: Temple, Texas
  • Surface Area: 298,500 SqFt
  • Contractor/Owner: Hill & Wilkinson General Contractors
  • Value: $11M
  • Category:
  • Scope: Turnkey
  • Type: Metal Building System

Why Choose Us

750+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »