Sure Steel, Inc. has the capability to develop, provide, and install turn-key Pre-Engineered Metal Buildings (PEMB). This is accomplished by partnering with professional PEMB suppliers that have the capabilities of designing PEMB’s to meet your needs and exceed your expectations. These partners include but are not limited to: Garco Building Systems, Varco Building Systems, and Nucor Building Systems. All PEMB’s will be fabricated using quality materials and proven methods that can efficiently satisfy a wide range of structural and aesthetic design requirements.

PEMB’s can be tailored to suit a wide variety of structural applications. An efficiently designed PEMB can be lighter than the conventional steel buildings by up to 30 percent. Lighter weight equates to less steel and a potential price savings in structural framework.

Project Highlight

Climax Molybdenum Autoclave Restart Project
View Full Project Profile

Climax Molybdenum Autoclave Restart Project

  • 200,000 square feet mill complex
  • Building height of 115 feet
  • 5,289 tons of structural and miscellaneous steel
  • 5 bridge cranes utilized, including one crane with a 110 ton capacity spanning 120 feet
  • Pre-Engineered Buildings with 2 inch insulated metal panels
  • Albany rubber roll-up doors
  • 81,620 manhours worked
  • Project site elevation 11,400 feet
  • Column web (depth) of: 6 feet on most columns

Metal Building Systems Projects

Bell County Equine/Livestock Complex

Sterilite Davenport Manufacturing & Distribution Facility

Morenci Metcalf 55k

Climax Molybdenum Autoclave Restart Project

FedEx Ground Houston Hub

Pratt & Whitney Hangar

Kennecott Utah Copper Cornerstone Project Concentrator Truckshop Expansion

Molycorp Minerals

Barrick Gold Cortez Hills Mine – F Canyon Mine

Project Mills Phase II

Fort Bliss Tactical Equipment Maintenance Facilities

KUC Moly Autoclave Processing Plant

Monsanto

Hexcel Project Ice Cream

Marana Armed Forces Reserve Center

Midwestern Pipeline Services

Great Salt Lake Minerals (Compass Minerals) Steam Boiler Plant Project

Kauai Biomass Power Plant

Morgan High School Trojan Century Field

Safety Stats

HOURS WORKED

3 M

Without Lost Time

EMR

0.51

Experience Modification Rate (7/1 to 6/30)

LTIR

0.00

Lost Time Incident Rate

DART

0.69

Days away, restricted, transferred (1/1 to 12/31)