Having completed countless construction projects over the years ranging in size and complexity, Sure Steel, Inc., has expertise in the erection of structural steel. With experience in all building types and conditions, Sure Steel, Inc. has the knowledge and experience to erect your next project.

Sure Steel, Inc. has attained an exceptional level of efficiency because of veteran superintendents, professional foremen, and skilled craftsmen. This experience provides the knowledge needed to complete the most demanding of projects. Having a culture of quality, safety, and an ability to complete projects ahead of schedule have developed a loyal and trusting clientele that continues to grow every year.

Project Highlight

Morenci Metcalf 55k
View Full Project Profile

Morenci 55K Metcalf Expansion

  • 6 Crushing Buildings, 3 Processing Buildings, and 3 Electrical Buildings
  • Erected 4,150 tons of structural and miscellaneous steel
  • Installed 400,550 sq. ft. of metal roof and wall panels
  • Installed 20 roof-mounted, exhaust fans
  • Installed multiple pieces of equipment, including:
    • (2) 113,000 lb. wet screens
    • 6 conveyors
    • 4 dust collection systems
    • (1) 99,000 lb. conveyor magnet
    • Installed 2 80’ span
    • Double girder
    • 75 ton overhead bridge cranes
    • 15 month duration
    • 214,152 direct man-hours worked
    • 6 subcontractors; 85,569 subcontracted manhours worked
    • Peak manpower: 170

Structural Steel Projects

Morenci Metcalf 55k

Barrick TCM Leach

Climax Molybdenum Autoclave Restart Project

HCA – Sunrise Hospital Bed Tower Expansion

UCHealth – Greeley Hospital

University of Utah – Farmington Health Center

HCA – Mountain View Medical Office Building

C-17 Corrosion Control Hangar

SkyWest Airlines – Truss Alteration & Hangar Door Upgrades

F-22 Squadron Operations/AMU

CHS – Barstow Community Hospital

KUC Flotation Expansion

Oracle Sequoia Data Center

Verizon Wireless Data Center

Utah Data Center

Missionary Training Center South Campus

Payson Utah Temple

Rexburg Idaho Temple

Dillard’s at Green Hills Mall

Loma Linda University Health – San Bernardino Medical Office Building

Oracle Sequoia Data Center UCF Cell 2.1 T.I

Project Nephogram

Project Frosty

Cornerstone at Cottonwood Phase II

Cabela’s Tooele Distribution Center 835

FA-22 Fueled Composite Aircraft Overhaul Test Facility

Bishops’ Central Storehouse

Freeport West Buildings #4 and #5

eBay Customer Service Center

IHC – McKay-Dee Ambulatory Surgical Center & Orthopedic Center

Myriad Genetic Phase 5

Salt Lake City Federal Bureau of Investigation Office Building

Adobe Utah Campus

Park City Film Studio

HCA – West Hills Hospital Helipad

CHS – Mesa View Regional Hospital

Steward Health Care – Mountain Point Medical Center

PeaceHealth – Ketchikan Medical Center

Goleta Valley Cottage Hospital

Utah Museum of Natural History

University of Utah Guest House

Provo Recreation Center

BYU Heritage Housing Buildings 7&8

IM Flash Technologies Building 40 Seismic Upgrade

Thatcher Company of Nevada Manufacturing Warehouse & Ancillary Facilities

Mona Waste Water Treatment Plant

Xactware Office Building

Rio Tinto North American Headquarters (Formerly Daybreak Corporate Center)

Petzl American Headquarters

Internal Revenue Service 100K Consolidated Office Building

Safety Stats

HOURS WORKED

3 M

Without Lost Time

EMR

0.51

Experience Modification Rate (7/1 to 6/30)

LTIR

0.00

Lost Time Incident Rate

DART

0.00

Days away, restricted, transferred (1/1 to 12/31)