The Park City Film Studio’s project consisted of multiple building types on a 29 acre studio campus. The largest portion of the project included three bays of film studios totaling just over 40,000 SqFt. The walls of the studios were made of ICF concrete while the roof was a steel structure. The two-story office portion that surrounds the film studios was a conventional steel structure that totaled approximately 20,000 SqFt and included many architectural canopies. In total, the project had just under 800 tons of steel. This project faced some unique challenges in that the project lost funding midway through, creating a time of uncertainty. In the end, the project was completed and ended up as an award-winning project. The studio was awarded the Utah Construction & Design most outstanding commercial/mixed-use development.
  • Location: Park City, UT
  • Surface Area: 20,000 SqFt
  • Contractor/Owner: Sahara Construction
  • Value: $2,000,000 - $5,000,000
  • Category:

Why Choose Us

600+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »