The Mills Phase II Warehouse & Office, located in Sparks, Nevada, is evidence of Sure Steel’s commitment and dedication to a successful project. The 88,344 SqFt data center, which consists of three separate but connected structures, was completed in a short 58 days, despite large scalefield changes to scope and an original ‘erect-only’ contracted schedule of just 68 days. Using strategic manpower coordination and practical solutions, Sure Steel’s project team decided to simultaneously utilize five-six separate crews and run three cranes in order to meet the tight schedule implemented by the general contractor. The 681 tons of steel and 643,000 SqFt of panels were erected without any safety incidences, making it another safe Sure Steel project.

  • Location: Reno, NV
  • Surface Area: 88,344 SqFt
  • Contractor/Owner: Ormaza Construction
  • Category:
  • Scope: Supply and Erect
  • Type: Pre-Engineered Metal Building

Why Choose Us

600+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »