- Location: Hickam AFB, HI
- Surface Area: 50,000 SqFt
- Contractor/Owner: URS Corporation
- Category: Transportation
- Scope: Supply and Erect
- Type: Structural Steel/PEMB Hybrid
This was a design/build hangar for the United States Air Force built at Hickam Air Force Base Hawaii. A hybrid building system was employed to integrate both structural steel and pre-engineered metal building components. The 50,000 SqFt, 90 foot tall hangar utilized a structural steel frame with open web joists, light gauge zee girts, insulated metal wall panels, as well as un-insulated single skin panels, and a Butler MR24 roof system. This project was supplied and erected by Sure Steel. All cladding and trims were designed and detailed by Sure Steel. Sure Steel worked over 21,631 hours on this project without a lost time accident or injury. Special rigging was required to erect the long span trusses that weighed in excess of 50,000 pounds.
Why Choose Us
750+
Installers
$750M
Aggregate Bond Capacity
#2
MCN Rank by Tonnage
#5
ENR Ranking 2025
187150
Tonnage in the last 5 Years
8M
Structural Steel SqFt in the last 5 Years
18M
Metal Building Systems SqFt in the last 5 Years
2.7M
Mass Timber SqFt in the last 3 years