Sure Steel was contracted by Swinerton Builders to erect the Southwest Airlines Denver Maintenance Hangar in Denver, CO. This turnkey, Structural Steel building was 134,226 SqFt, over 2,200 tons of steel, and over 90,000 SqFt of IMP. Our Sure Steel team worked more than 62,700 man hours on this project. It was completed in 2020.
SWA DEN Truss lift
  • Date: August 2020
  • Location: Denver, CO
  • Surface Area: 134,226 SqFt
  • Contractor/Owner: Swinerton Builders
  • Category: ,
  • Scope: Turnkey
  • Type: SS

Safety Stats

HOURS WORKED

2M

Without Lost Time

EMR

0.52

Experience Modification Rate (7/1 to 6/30)

LTIR

0.00

Lost Time Incident Rate

DART

0.00

Days away, restricted, transferred (1/1 to 12/31)

Translate »