Sure Steel worked with McCarthy Building Companies to erect the Southwest Airlines HOU Maintenance Hangar in Houston, TX. This 246,600 SqFt turnkey, Metal Building System (MBS) maintenance hangar consisted of 2,098 tons of steel and 101,600 SqFt of IMP. It was completed in 2019 after 92,352 man hours.
SWA HOU Finished
  • Date: 2019
  • Location: Houston, TX
  • Surface Area: 246,600 SqFt
  • Contractor/Owner: McCarthy Building Companies
  • Category: ,
  • Scope: Turnkey
  • Type: MBS

Safety Stats

HOURS WORKED

2M

Without Lost Time

EMR

0.52

Experience Modification Rate (7/1 to 6/30)

LTIR

0.00

Lost Time Incident Rate

DART

0.00

Days away, restricted, transferred (1/1 to 12/31)

Translate »