This confidential turnkey, structural steel data center is located in Utah. The 541,480 SqFt data center need 64,728 man hours and was completed in 2021.
EAG3
  • Location: Eagle Mountain, Utah
  • Surface Area: 541,480 SqFt
  • Category:
  • Scope: Turnkey
  • Type: Structural Steel

Safety Stats

HOURS WORKED

2M

Without Lost Time

EMR

0.52

Experience Modification Rate (7/1 to 6/30)

LTIR

0.00

Lost Time Incident Rate

DART

0.00

Days away, restricted, transferred (1/1 to 12/31)

Translate »