This confidential turnkey data center is located in Utah and is evidence of Sure Steel’s commitment and dedication to a successful project. The 1,008,638 SqFt, 60 Mega Watts data center was completed in 2019.
EAG1&2
  • Location: Eagle Mountain, Utah
  • Surface Area: 1,008,638 SqFt
  • Category:
  • Scope: Turnkey
  • Type: Structural Steel

Safety Stats

HOURS WORKED

2M

Without Lost Time

EMR

0.52

Experience Modification Rate (7/1 to 6/30)

LTIR

0.00

Lost Time Incident Rate

DART

0.00

Days away, restricted, transferred (1/1 to 12/31)

Translate »