This confidential data center in Texas is a turnkey, design-build PEMB and IMP project. On this 30,000 SqFt data center, we installed 53,516 SqFt of IMPs. It was completed in 2020 after 18,408 man hours.
Data Centers - Sure Steel, Inc.
  • Location: Midlothian, Texas
  • Surface Area: 30,000 SqFt
  • Category:
  • Scope: Turnkey
  • Type: PEMB

Why Choose Us

750+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »