- Location: Provo, UT
- Surface Area: 530,000 SqFt
- Contractor/Owner: Okland | Jacobsen | Layton
- Category: Advanced Technology
Located on the foothills of Provo, Utah, the Provo Missionary Training Center South Campus consists of three separate buildings, adding over 530,000 SqFt to the existing campus. Each structure is six stories tall with a common parking garage below. The structural design utilized the SidePlate welded moment frame system connection. This seismic system provided an open floor plan and superior structural integrity for the high seismic location.
Due to the tight schedule and large tonnage, Sure Steel contracted with two separate fabricators to fabricate the steel. This allowed us to get over 5,300 tons on the job site quickly and also allowed for extra capacity should one fabricator get behind.
At peak, Sure Steel had over 120 erectors on site, working in four separate crews to erect two of the structures simultaneously before moving to the third.
Why Choose Us
750+
Installers
$750M
Aggregate Bond Capacity
#2
MCN Rank by Tonnage
#5
ENR Ranking 2025
187150
Tonnage in the last 5 Years
8M
Structural Steel SqFt in the last 5 Years
18M
Metal Building Systems SqFt in the last 5 Years
2.7M
Mass Timber SqFt in the last 3 years
Let's Connect
If you have a project that you would like to discuss with us, we would be more than happy to connect with you and provide you with expert consultation and advice. Contact us today to schedule a consultation and take the first step towards turning your project into a success story.
Contact Us