Sure Steel partnered with Turner Construction to complete a 232,400 SqFt data center in Iowa. The 48 Mega Watts project involved 79,200 SqFt in IMPs and was completed in 2019.
Data Centers - Sure Steel, Inc.
  • Location: Iowa
  • Surface Area: 232,400 SqFt
  • Category:
  • Scope: Turnkey
  • Type: PEMB
  • Tons: 1,409

Why Choose Us

600+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »