The Bishops’ Central Warehouse was a complete steel package to furnish and install all of the structural steel and insulated metal wall panels. This project covers approximately 615,000 square feet and includes a freezer/cooler area in the building foot print and includes the following specific areas:
  • Rack Storage Areas – 297,695 square feet
  • Bulk Storage Areas – 210,884 square feet
  • Freezer/Cooler/Cold Dock Areas – 63,000 square feet
  • Fleet Service Bays and Admin Offices – 43,900 square feet
One of the unique features of the new storehouse is the fact that it was built under seismic guidelines to withstand a 7.0 earthquake and to stay in operation during an earthquake of that magnitude. Sure Steel participated extensively in the design process in a design/assist role and helped to incorporate various changes to the structure to expedite the construction schedule.
  • Location: Salt Lake City, UT
  • Surface Area: 615,000 SqFt
  • Contractor/Owner: Layton Construction
  • Category:
  • Scope: Supply and Erect
  • Type: Structural Steel
  • Tons: Insulated Metal Wall Panels
  • : 1
  • : 557

Why Choose Us

600+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »