The restricted site and limited access for the Verizon Wireless Data Center were no match for Sure Steel and their proficient project team. The two-story, 130,500 SqFt data center in Rocklin, California required heavy coordination and strategic planning from Sure Steel in order to supply and erect the 1,405 tons of steel safely and on time, but Sure Steel worked closely with all project stakeholders to complete the $4.6M turnkey contract in a safe and efficient manner. Sure Steel leveraged just-in-time deliveries to overcome the minimal laydown yard, utilized 19,500 man hours and overtime to meet the aggressive 12-week time frame, and provided a full-time, on-site safety manager to make sure that everyone went home safe each day.
Verizon Wireless Data Center
  • Location: Rocklin, CA
  • Surface Area: 130,445 SqFt
  • Contractor/Owner: Holder Construction
  • Category:
  • Scope: Supply and Erect
  • Type: Structural Steel

Why Choose Us

600+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »