Strategically placed on the benches of Lehi, Utah, this uniquely designed 193,958 SqFt medical center is a welcome addition by the residents of Utah County. The Mountain Point Medical Center project consisted of two separate buildings: the Medical Center Hospital and the Professional Office Building. Sure Steel was contracted by Layton Construction to provide all the labor and equipment to erect the structural steel for both buildings. A component that this project implemented was the unique seismic system utilized in the design. SidePlate® system, a seismic bracing design system, required many fillet weld connections to accommodate the SidePlate® components. Through our skills and abilities, Sure Steel was able to face the unique situation head on. In just over four months, Sure Steel was able to erect approximately 2,050 tons of structural steel, meeting the general contractor’s tight schedule.

Lehi Medical Center and Professional Office Building
  • Location: Lehi, UT
  • Surface Area: 193,958 SqFt
  • Contractor/Owner: Layton Construction Co., Inc.
  • Value: Under $2,000,000
  • Category:
  • Scope: Erect Only
  • Type: Structural Steel
  • Tons: 2
  • : 050

Why Choose Us

750+

Installers

$750M

Aggregate Bond Capacity

#2

MCN Rank by Tonnage

#5

ENR Ranking 2025

187150

Tonnage in the last 5 Years

8M

Structural Steel SqFt in the last 5 Years

18M

Metal Building Systems SqFt in the last 5 Years

2.7M

Mass Timber SqFt in the last 3 years

Translate »