- Location: West Hills, CA
- Contractor/Owner: Layton Construction Co., Inc.
- Value: Under $2,000,000
- Category: Healthcare
- Scope: Supply and Erect
- Type: Structural Steel
- Tons: 114
Located just outside of Los Angeles, the West Hills Hospital Helipad was a complex and rewarding project for Sure Steel The scope of this project required Sure Steel to open up the existing roof of a four story structure, connect to the existing SidePlate® system and add stub columns to support the new helipad. Access from the rooftop to the existing building was also added. With occupant safety as the number one priority, Sure Steel carefully constructed the vertical expansion while keeping the fourth floor ICU operational for doctors and patients and assisted emergency response crews to ensure safe transport. Working with OSHPD to meet established standards and quality, Sure Steel supplied and erected the 114 tons of galvanized steel in four weeks. Sure Steel maintained the highest of safety standards and completed the project one week ahead of schedule and on budget.
Why Choose Us
600+
Installers
$750M
Aggregate Bond Capacity
#2
MCN Rank by Tonnage
#5
ENR Ranking 2025
187150
Tonnage in the last 5 Years
8M
Structural Steel SqFt in the last 5 Years
18M
Metal Building Systems SqFt in the last 5 Years
2.7M
Mass Timber SqFt in the last 3 years
