- Location: Rexburg, ID
- Surface Area: 64,000 SqFt
- Contractor/Owner: Jacobsen Construction
- Category: Advanced Technology
- Scope: Supply and Erect
- Type: Structural Steel
- Tons: 600
Dedicated in 2008, the Rexburg, Idaho temple became the 3rd Church of Jesus Christ of Latter-Day Saints in Idaho, and the 125th operating temple worldwide. Braced by a steel frame, the 57,500 SqFf temple displays a beautiful precast exterior. Sure Steel was contracted by Jacobsen Construction to provide design-assist services for the structural steel package.
Sure Steel was involved early on in the project by providing budget numbers and design assist recommendations to optimize costs as it related to steel fabrication and erection. This involvement allowed the project to be within budget and helped facilitate a timely erection schedule.
Sure Steel supplied and installed the 600 tons of steel within the project schedule, battling the harsh Rexburg winter, all while maintaining the highest level of quality that the Church expects and requires on their projects.
Why Choose Us
600+
Installers
$750M
Aggregate Bond Capacity
#2
MCN Rank by Tonnage
#5
ENR Ranking 2025
187150
Tonnage in the last 5 Years
8M
Structural Steel SqFt in the last 5 Years
18M
Metal Building Systems SqFt in the last 5 Years
2.7M
Mass Timber SqFt in the last 3 years
Let's Connect
If you have a project that you would like to discuss with us, we would be more than happy to connect with you and provide you with expert consultation and advice. Contact us today to schedule a consultation and take the first step towards turning your project into a success story.
Contact Us